Projects

Asset Recovery & Recycling

The Grounds at Concord

DHG Wrecking completed the demolition of the former Phillip Morris manufacturing facility in...

Structural Demolition

Former Charlotte Observer | Legacy Union

Environmental abatement and demolition of the Charlotte Observer existing office and production...

Demolition

Abatement, Demolition, and site work of the Largest Textile Facility in the World for Future Caesar’s Casino

D.H. Griffin's project at the Dan River Mills textile plant is an example of providing turnkey...

Demolition

D.H. Griffin Responds to Explosion at North Carolina Manufacturing Facility

D.H. Griffin deployed both machines and people to respond to an explosion at a manufacturing...

Demolition

Demolishing Dominion’s Office Tower in Downtown Richmond, Virginia

D.H. Griffin was selected as the contractor for the environmental abatement and demolition of...

Demolition

The Grounds At Concord: Turnkey Environmental, Demolition and Site Work

D.H. Griffin was selected as the turnkey contractor for the redevelopment of the Grounds at...

Structural Demolition

Richmond Times News

Renovation & demolition project in busy downtown Richmond included abatement of three buildings;...

Demolition

Vines Center Dome at Liberty University

DHG will be removing the 200‘ diameter geodesic dome on the Vines Center at Liberty University. 

Asbestos Abatement

Southern Company: Plant Yates Units 1-5

• Decommissioning of five unit 1,250 MW coal fired power plant • Asbestos abatement and...

Demolition

Dan River Steam Station

Abatement and demolition of a 340-MW power plant which includes coal-fired steam generating units...

Structural Demolition

Demolition of Spring Street Viaduct Bridges

DHG was subcontracted by C.W. Matthews to demolish and remove the two viaducts in downtown Atlanta.

Explosives Demolition

Duke Energy | Cliffside Steam Station Units 1-4

In December 2015, D.H. Griffin Wrecking completed demolition of the Cliffside Steam Station, a...

Selective Demolition

St Joseph Hospital Facade Removal

Complete removal of the exterior facade, brick and precast, of a 7 story hospital through the...

Universal Waste Removal

Chemical Resins Facility (Anonymous)

DHG contracted to dismantle and remove all equipment, tanks, piping and ancillary equipment at...

Asset Recovery & Recycling

Dominion Resources Asset Recovery

Asset recovery project for Dominion Resources involving the dismantling and purchase of obsolete...

Demolition

Fulton County Stadium Demolition

Project consisted of the removal of asbestos containing materials and the complete demolition and...

Environmental Remediation

High Point University, Underground Tank Closure

High Point University, an expanding university located in North Carolina’s Piedmont Triad,...

Demolition

A Complete Facility Conversion: turnkey project utilizing multiple DHG Companies transforming a brewery into a world class pet food facility with Nestle-Purina

D.H. Griffin along with private partners, purchased the former MillerCoors facility in 2018 after...

Demolition

Robert Hitch Village Housing

DHG contracted by the Housing Authority of Savannah to provide the demolition and removal of 51...

Structural Demolition

Sewells Point Fuel Terminal

Demolition and removal of fuel tanks, pumps and associated debris at this Naval Base fuel...

Selective Demolition

Bank Of America Stadium Scoreboard

In 2014, D.H. Griffin Wrecking completed selective demolition of two large scoreboards inside...

Selective Demolition

Emergency Services |UNCG Spartan Village Fire

DHG was contacted by Samet/Barton Malow/SRS to assist them and the fire department in response to...

Selective Demolition

Furman University Press Box Demolition

D. H. Griffin Wrecking contracted by Furman University to provide the demolition and removal of...

Site Development

Rose Tower, University Of Alabama

Demolition and abatement of this 13 story landmark on the University of Alabama campus. Work...

Asbestos Abatement

Camp Lejeune Pre-Trial Detainee Facility

Complete abatement and demolition of multiple building associated with the Pre- Trail Detainee...

Asbestos Abatement

Cincinnati Millworks - Oakley Power Station Demolition

Abatement and demolition of the 600,000 sf Oakley Power Station, including multiple structures....

Structural Demolition

Ecusta Paper Plant

Work began May 2008 on the demolition and removal of the entire defunct paper mill in mountains...

Environmental

Wake Forest Innovation Quarter | Bailey Power Plant

DHG and DARI provided the exterior clean up of the Bailey Power Plant in downtown Winston-Salem.

Demolition

Antoine Graves Public Housing Demolition

DHG subcontracted by Winter Environmental to provide the demolition of two multi story buildings...

Demolition

R.J. Reynolds Power Plant Dismantling Tobaccoville

D.H. Griffin awarded contract to match-mark and dismantle this coal fired power house, including...

Structural Demolition

1285 Peachtree

DHG contracted to perform the demolition and removal of two buildings and a parking deck. The...

Asbestos Abatement

Public Housing | Piedmont Courts Abatement and Demolition

DHG performed the asbestos removal and demolition of 34 buildings. Project included over 230,000...

Demolition

Carolina Plaza USC

DHG & affiliate DARI provided the removal of asbestos & demolition of the 14-story Carolina Plaza...

Demolition

Lamar Terrace | Public Housing Abatement and Demolition

Abatement and demolition of this public housing complex. DHG performed 100% of the demolition of...

Selective Demolition

Nissen Apartment Building Renovations

DARI contracted by Holder Construction for this asbestos abatement and complete interior gut of...

Demolition

Plant Arkwright Demolition

Asbestos removal & demolition of this 368,000 SF power generating facility in Macon, GA.

Demolition

Cinergy Field Demolition

On December 29, 2002, D. H. Griffin Wrecking Co., Inc. (DHG) imploded the Cinergy Field baseball...

Demolition

“Industrial Demolition Done Right”

D.H. Griffin and DARI partner together on the environmental abatement and demolition of an old...

Heavy Rigging

Removal of Press Boxes, Neyland Stadium(University of Tennessee)

Project involved the removal of the press boxes atop the stadium. These press boxes were cut...

Structural Demolition

Gator Bowl Stadium Demolition

Within days of the final game played in the stadium, DHG began the demolition of the Gator Bowl...

Demolition

New Orleans Hard Rock Hotel Construction Emergency - Cranes Demolition

On Saturday, October 12, 2019, there was a collapse of a portion of the Hard Rock Hotel under...

Demolition

Cape Canaveral Launch Towers

Contractors worked within stringent Air Force safety guidelines to take down two launch towers...

Plant/Process Decommissioning

Purdom Unit #7 Boiler Structure Demolition

Demolition of the Purdom Generating Station's Unit #7 Boiler, 180' tall stack, some associated...

Plant/Process Decommissioning

Duke Energy's Turner Station Demolition

Demolition and removal of four (4) peaker units, warehouse, GSUs, ancillary structures and...

Demolition

Arras Building - Former BB&T Tower

• Removal of exterior curtain wall from former BB&T Tower in Downtown Asheville • Building 19...

Demolition

Plant Kraft Units 1-4

• Asbestos abatement and demolition of 281 MW coal and gas fired Plant Units 1-4 • Units 1-3...

Demolition

Hammond Exchange Building

• 10-story, 200,000 office building • Building was concrete construction, exterior glass...

Emergency Response Services

I-85 Bridge Collapse Emergency Response Demolition

DHG mobilized within 24 hours of the fire and began the demolition and removal of the damaged...

Asbestos Abatement

Harrelson Hall at NC State University

• Tight confines on active campus • Asbestos abatement and demolition of 125,000 sf circular...

Asbestos Abatement

Duke Energy: W.S. Lee Steam Station

DHG contracted to abate and demolish the three retired precipitator units of this 370 MW power...

Structural Demolition

VCU Gladding Residence Center 1 and 2

The DHG Companies completed abatement and demolition and removal of four (4)-story dorm...

Heavy Rigging

UNC Charlotte Belk Tower Demolition

DHG contracted to provide the dismantling and removal of the 142-foot tall Belk Tower on the UNC...

Demolition

Demolition of War Memorial Auditorium

Project involved the demolition of two structures: the former Norvell Tent Company, a single...

Demolition

Demolition and Abatement of Coal Facility in Paradise, KY

D.H . Griffin Wrecking was selected as the lead contractor for the dismantlement of a coal plant...

Demolition

Emergency Demolition Response: Arecibo Observatory

D.H. Griffin Wrecking Company was the selected contractor for emergency demolition work on the...

Demolition

DHGW: Duke Energy “Asheville Steam Station”

The Duke Energy “Asheville Steam Station” project included decommissioning the coal yard items,...

Demolition

Cane Run: Power Plant Demolition

DHG contracted with LG&E and KU Companies for the abatement and demolition of the Cane Run...

Demolition

Clara Cox Homes

D. H. Griffin Wrecking Co., Inc. was contracted to perform the asbestos removal and complete...

Demolition

Demolition of Coal Fired Power Facility in Florida

D.H. Griffin was selected as the contractor for the multi-phase environmental abatement,...

CPS Energy

DARI contracted by DHG of Texas to perform the abatement of this CPS Energy power plant being...

Demolition

Former BB&T Headquarters Imploded in Wilson, NC

D.H. Griffin Wrecking Company was selected as the commerical demoltion contractor for the...

Demolition

D.H. Griffin Demolishes Fudrucker’s on Prime Real Estate Parcel in Asheville, NC:

D.H. Griffin Wrecking’s Asheville team recently completed an urban infill project in Asheville,...

Demolition

DHGW: Jacksonville Landing

DHG Wrecking completed the demolition of the Jacksonville Landing in Florida. The city’s...

Demolition

Nashville Yards: Demolition and Abatement

D.H. Griffin was selected by Southwest Value Partners to do the environmental abatement and...

Selective Demolition

Projects | Sanford WTP Clearwell Rehab

DARI Saw cutting and Drilling Division to perform core drilling and lifts to remove structural...

Demolition

Sullivan Tower-Nashville

D.H. Griffin was responsible for the demolition of Sullivan Tower, a long-standing structure in...

Demolition

University of Alabama: Tutwiler Hall Abatement and Demolition

D.H. Griffin Wrecking Company began discussions with the University of Alabama for the demolition...

Demolition

D.H. Griffin Demolishes Valleydale Meat Packing Facility in Salem, VA

The demolition of the former Valleydale Meat Products building in Salem is now complete. The...

Demolition

World Trade Center- Site Manager for Demolition Operations

D.H. Griffin’s president, David H. Griffin, Jr. traveled to New York City following the terrorist...

Demolition

Winkler Hall Abatement & Implosive Demolition

Demolition of 10-story dormitory on busy college campus. Asbestos removal of entire structure to...

Demolition

Downtowner Motel Danville

DHG contracted by the Industrial Development Authority of Danville to provide the abatement and...

Demolition

FP&L

Asbestos abatement, demolition and removal of FP&L's 1,200-megawatt Port Everglades Power Plant...

Demolition

Myrtle Beach Hotels Apartments

Complete demolition of two hotels on North Ocean Blvd in busy Myrtle Beach, SC. One hotel was 8.5...

Demolition

Noonjin Building Gadsden

DHG performed the demolition of this 93-year old brick structure using hand work and long arm...

Demolition

Demolition of Roy E. Hansel Power Plant

Demolition and dismantlement of the Roy E. Hansel Power Plant for the City of Kissimmee/Kissimmee...

Demolition

VSU Dormitory Abatement & Demolition

Removal of asbestos and demolition of Howard Hall on Virginia State University campus.

Demolition

Tuskegee University, Tompkins Hall Project

Demolition and abatement of this multi story dining hall on the Tuskegee University Campus.

Demolition

Alabama Power Plant Gorgas

In August 2012, D.H. Griffin Wrecking completed a 750,000 square foot demolition and abatement...

Demolition

Bayer Crop Science

DHG contracted by Bayer Crop Science under CH2MHill for this industrial demolition project. Scope...

Demolition

Center For Disease Control

Phased abatement and demolition of various buildings and pedestrian bridges on the CDC campus....

Demolition

BASF Dismantlement

Structural demolition of the former Vitamin B and Vitamin C production facility in Wilmington,...

Demolition

Phillips Building (Selective Demolition)

DARI contracted by Forsyth County to perform the abatement and total gut of this 10-story...

Demolition

Georgia Power Plant Riverside Savannah

DHG contracted by Georgia Power to perform the asbestos abatement and dismantlement of historic...

Structural Demolition

William Fleming High School Abatement and Demolition

Demolition and asbestos abatement of eight structures

Demolition

Ford Assembly Plant Hapeville

D. H. Griffin Wrecking Co., completed the decommissioning and demolition of the Ford Assembly...

Demolition

Marcus Stubbs Tower

Asbestos removal and demolition of 15-story apartment building in Savannah, GA. 185,000 sf...

Demolition

Fieldcrest Cannon Plant

DHG was contracted by Atlantic American Properties Inc. to perform one of the largest demolition...

Demolition

Burlington Industries

DHG responsible for the abatement of this 433,000 sf complex before DHG successfully imploded the...

Explosives Demolition

NC State University Stadium Press Box

DHG removed the west stands press box and support columns from Carter Finley Stadium using...

Selective Demolition

University of Florida - Press Box Tower Renovation

DHG was contracted to perform the selective demolition associated with the two-year, $50 million...