Eastern North Carolina
Owner/Client: Anonymous
Project Completed: May 2015 - Dec 2017
DHG contracted to dismantle and remove all equipment, tanks, piping and ancillary equipment at this former chemical resins facility including universal waste removal, erosion control and site restoration. DHG utilized both conventional and implosive demo onsite. Work included bringing down an elevated water tower and large boiler house. The elevated water tank was 180' tall supported on 6 legs and had a 200,000 gallon capacity. Universal Waste removal, industrial cleaning, hazardous materials and hazardous waste removal also included in Scope of Work.
Project Summary:- Large Industrial decommissioning and demolition
- RCRA site requiring 40 Hour HAZWOPER training for all site personnel
- Industrial cleaning and hazardous materials removal.
- Demolition included both mechanical and implosive demolition techniques.
- DHG salvaged hundreds of pieces of process equipment and vessels for resale.
- Approximately 60,000 tons of scrap metal were recycled.