Before:
After:
NCSU – Harrelson Hall Abatement and Demolition
Raleigh, NC
Owner/Client:
NCSU / Kimley-Horn and Associates, Raleigh, NC
Video:
Time Lapse Video of Harrelson Hall Demolition
Project Summary:
• Tight confines on active campus
• Asbestos abatement and demolition of 125,000 sf circular structure
• DHG mechanically demolished the structure using a specialty ultra high reach long arm excavator with a 95’ reach
• Asbestos abatement performed by DHG affiliate Demolition & Asbestos Removal Inc. (DARI) and included textured ceiling plater, TSI, floor tile and mastic, fire doors, window glazing and various asbestos containing mastics
• Work included site redevelopment by D.H. Griffin Infrastructure, LLC including put back of a courtyard, grading and paving
Project Timeline:
Jan 2016 - March 2017