Projects | Harrelson Hall at NC State University

Before:

harrelson during demo

After:

harrelson finished plaza

NCSU – Harrelson Hall Abatement and Demolition
Raleigh, NC

Owner/Client:

NCSU / Kimley-Horn and Associates, Raleigh, NC

Video:

Time Lapse Video of Harrelson Hall Demolition

Project Summary:

Tight confines on active campus
• Asbestos abatement and demolition of 125,000 sf circular structure
• DHG mechanically demolished the structure using a specialty ultra high reach long arm excavator with a 95’ reach
• Asbestos abatement performed by DHG affiliate Demolition & Asbestos Removal Inc. (DARI) and included textured ceiling plater, TSI, floor tile and mastic, fire doors, window glazing and various asbestos containing mastics
• Work included site redevelopment by D.H. Griffin Infrastructure, LLC including put back of a courtyard, grading and paving

Project Timeline:

Jan 2016 - March 2017