Sanford WTP Clearwell Rehab

DARI Saw cutting and Drilling Division to perform core drilling and lifts to remove structural materials during this WTP rehab. DARI to remove double tee roof and topping slab from structure and cut all columns and beams supporting the roof to make room for a new hollow core roof system. DARI also responsible for drilling 16"-36" diameter cores thru various thicknesses of concrete for temporary and new piping.

PROJECT SUMMARY:
  • Core drilling and lifts
  • Removed double tee roof and topping slab from structure.
  • Concrete core drilling 16” to 36” diameter holes thru various thicknesses to allow for piping.

PROJECT COMPLETED:
Jan 2010—March 2010