Projects | Asbestos Removal from CPS Energy

cps energy

CPS Energy Mission Rd Power Plant
San Antonio, TX

DARI contracted by DHG of Texas to perform the abatement of this CPS Energy power plant being renovated with partial demolition. Plant covers 5.4 acre site. Owner contracted ERM-SW to provide environmental oversight. Removal included 4,400 lf piping, 162,500 sf boiler insulation, galbestos siding, roofing and other asbestos containing materials.

Owner/Client:
CPS Energy / D.H. Griffin of Texas / S&ME

Project Summary:

DARI contracted by DHGT for abatement
• Removed 4,400 lf TSI piping; 162,500 sf boiler insulation
• Galbestos siding removed

Project Schedule:
May - Dec 2009