Noojin Building Demolition
Gadsden, AL
DHG performed the demolition of this 93-year old brick structure using hand work and long arm attachment on excavator. Much of the 7-story was in close proximity to remaining structures, necessitating much of the work to be done by hand.
Owner/Client:
City of Gadsden
Project Summary:
• 93-Year old brick building
• 7-Story Building
• Close proximity to other structures to remain required hand work for much of the demolition.
Project Completed:
Apr 2013 - Aug 2013